Demolition

Decontamination/
Decommissioning


Site Remediation

Facility Infrastructure

Facility Infrastructure
   

Bio Diesel Manufacturer – South-West
  • As part of plant commissioning and ongoing maintenance activities at the largest biofuels terminal and blending facility in the US, VIASANT crews perform industrial cleaning and painting activities to improve appearance, production efficiency and product quality.
  • Decontamination activities include high pressure water blasting methods to remove residual product, impurities, rust and scaling in fuel tanks and process equipment.
  • Proper confined space entry procedures implemented, including carbon filtration and chemical additive processes to de-gas applicable tanks,  addressing raised levels of flammable vapors and LEL to ensure safe entry into tanks.
  • Hydro-blasting and media blasting of interior and exterior surfaces of tanks to remove existing paint and rust in preparation for epoxy application.
  • Three-layer, two-part epoxy coating applied to interior and exterior surfaces of tanks, vessels and catwalks.